If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

New builds - how many will ever really work?

Discussion in 'Steam Traction' started by Maunsell man, Aug 23, 2011.

  1. TenWheeler

    TenWheeler New Member Account Suspended

    Joined:
    Jul 10, 2011
    Messages:
    149
    Likes Received:
    4
    You could always slightly increase the cylinder bore and/or the boiler pressure. The class 4 was a 225 lb boiler, but the class 3 only 200.
     
  2. Lplus

    Lplus Well-Known Member

    Joined:
    Nov 24, 2011
    Messages:
    1,919
    Likes Received:
    991
    Location:
    Waiting it out.
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Raising the boiler pressure would involve recalculation and possibly modification, not something that would be undertaken lightly, I suspect.

    I wasn't thinking of the adhesion weight or tractive effort, more the ability of the small boiler to produce steam fast enough. My memory is telling me I've read that they did get short of steam on occasions.
     
  3. TenWheeler

    TenWheeler New Member Account Suspended

    Joined:
    Jul 10, 2011
    Messages:
    149
    Likes Received:
    4
    Stay pitch might change slightly, but in any case building a new boiler requires qualification procedures which far outweigh the work required to make detail changes. All the calculations have to be presented whatever you do.

    Strength and power are two different things. For running on preserved lines I don't think boiler capacity would be much of an issue. Steaming problems on comparatively modern engines was more to do with maintenance than basic design.
     
  4. northernsteam

    northernsteam Member

    Joined:
    May 25, 2010
    Messages:
    593
    Likes Received:
    271
    Gender:
    Male
    Occupation:
    Used to be in civil engineering, highway bridges.
    Location:
    Tyne and Wear
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    When the Standard Steam Locomotive Company was set up in 1995 it was intended that once 72010 was built and running they would turn attention to the other Standards which were missing.
    Time has overtaken the progress of the Clan and other groups have taken up the challenge of re-building the missing examples, on behalf of SSLC I would say thank you.
    77xxx is a missing link, if not the only one missing, I did hear a rumour that a project may start to remedy that. As said here, there will soon be a wealth of standard parts/patterns available.
    Question for you all, once we have built all the Standards, do we repeat the popular/efficient ones??
     
  5. Reformed Sniper

    Reformed Sniper New Member

    Joined:
    Nov 6, 2008
    Messages:
    58
    Likes Received:
    44
    No, once the full set is complete build the 8F 2-8-2.
     
  6. Maunsell man

    Maunsell man Well-Known Member

    Joined:
    May 1, 2006
    Messages:
    1,593
    Likes Received:
    505
    Occupation:
    Senior Finance Auditor
    Location:
    Kent
    Build one first then look at something else. Walking before running again...
     
  7. Neil_Scott

    Neil_Scott Part of the furniture

    Joined:
    Apr 25, 2008
    Messages:
    3,155
    Likes Received:
    302
    Gender:
    Male
    Occupation:
    Railway servant
    Location:
    Worcester
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    And then worry about maintaining, operating and financing your first one.
     
  8. Sidmouth

    Sidmouth Resident of Nat Pres Staff Member Moderator

    Joined:
    Sep 12, 2005
    Messages:
    9,676
    Likes Received:
    8,408
    Gender:
    Male
    Location:
    Alderan !
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Whilst a production tun of new builds 82*** tanks may be desirable its the railways or individuals ability to pay for them that will hamper this

    there are a number of highly desirable engines on the market and no takers to buy them

    what may work as a business case is a company financing a production run and then leasing them to preserved railways but it becomes a big financial risk with a long payback
     
  9. Neil_Scott

    Neil_Scott Part of the furniture

    Joined:
    Apr 25, 2008
    Messages:
    3,155
    Likes Received:
    302
    Gender:
    Male
    Occupation:
    Railway servant
    Location:
    Worcester
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    What interests me about the current new builds are those which do not have a boiler. My understanding of 60163 is that the A1 Trust took out a large bond to pay for the construction of the boiler.

    For a popular engine like 60163 it probably won't face a problem in paying off the bond - but how will smaller, less prestigous locomotives earn £300 - 400k to pay back a loan or a bond? I wonder if some new build groups are going to be faced with a huge amount of debt once the locomotive has been constructed.
     
  10. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    Joined:
    Apr 15, 2006
    Messages:
    16,513
    Likes Received:
    7,762
    Location:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    More likely no payback.
     
  11. gwr4090

    gwr4090 Part of the furniture

    Joined:
    Aug 8, 2005
    Messages:
    2,847
    Likes Received:
    222
    Gender:
    Male
    Occupation:
    Scientist (Rtd)
    Location:
    Dorset
    Boiler repairs of previously restored locos can sometimes cost £200K-£300K, so boiler funding is not exclusively a new-build issue, but a few groups have successfully managed to cope with this.

    David
     
  12. Neil_Scott

    Neil_Scott Part of the furniture

    Joined:
    Apr 25, 2008
    Messages:
    3,155
    Likes Received:
    302
    Gender:
    Male
    Occupation:
    Railway servant
    Location:
    Worcester
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That's true David but some groups will have support of a home railway to help them finance extensive boiler overhauls. At the current time I can't see any railway helping fund a new build to the tune of hundreds of thousands of pounds.

    What I'm suggesting is that new build groups won't have the option of letting an engine on X railway for Y years to pay off a debt but instead have a commercial debt (or near enough) to maintain which might be difficult.
     
  13. L&NWR

    L&NWR New Member

    Joined:
    Apr 2, 2011
    Messages:
    33
    Likes Received:
    0
    Re the Jeep. There was talk of a duplicate being built in Ireland. Is this still live? If so it would be an obvious starting point for discussion on a Fow;ler 2-6-4 tank. Also I note the Patriot pony truck has wheels of 3'2" diameter. Are these identical to those on the LNWR 'George the Fifth'.
     
  14. michaelh

    michaelh Part of the furniture

    Joined:
    Apr 29, 2006
    Messages:
    3,080
    Likes Received:
    1,291
    Gender:
    Male
    Occupation:
    Very comfortably early retired
    Location:
    1029
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Now that is something to which I'd make a substantial (financial) contribution.
     
  15. guard_jamie

    guard_jamie Part of the furniture

    Joined:
    Jul 7, 2008
    Messages:
    2,503
    Likes Received:
    27
    Gender:
    Male
    Occupation:
    Signalman
    Location:
    Herefordshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There are many locomotive groups that do not rely on 'home railway support' for overhauls, surely? Moreover, why shouldn't a newbuild loco have the option of their loco operating on a railway to pay off a debt?
     
  16. Neil_Scott

    Neil_Scott Part of the furniture

    Joined:
    Apr 25, 2008
    Messages:
    3,155
    Likes Received:
    302
    Gender:
    Male
    Occupation:
    Railway servant
    Location:
    Worcester
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Sure some, but how many are requiring £300 - 400k for a new boiler or the cost of a major overhaul (for example)?

    The answer to your second question is that you're supposing that a railway currently has access to £300 - 400k to help finance a new build and looking at some of our biggest railways - SVR & NYMR - I can't see that kind of money being forthcoming.
     
  17. Gav106

    Gav106 Well-Known Member

    Joined:
    Mar 29, 2010
    Messages:
    1,742
    Likes Received:
    2,017
    Location:
    Nantwich, Cheshire
    The lms patriot has 3'3.5'' the same as an 8f as their using two 8f wheelsets. Although they Will have to use an 8f axle box on the front bogie which Will be different from the originals.

    With regards to "jeep" yes it was mentioned somewhere a while back about another being produced. Don't know if it was true or not. Or if they have drawings. But I'm sure if they were going to do one a group doing a fowler 2-6-4t would benefit from duplicate parts. That's of course as long as they share compatible components in the first place.

    What else off of a fowler 2-6-4t is compatible with other locos? Drivers and front and rear trucks with staniers 2 and 3 cylinder tanks?

    Gavin
     
  18. guard_jamie

    guard_jamie Part of the furniture

    Joined:
    Jul 7, 2008
    Messages:
    2,503
    Likes Received:
    27
    Gender:
    Male
    Occupation:
    Signalman
    Location:
    Herefordshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Perhaps not, but there can be a 'quid pro quo' agreement on the use of equipment and expertise that may make savings in other areas of the project. A great saving may be made by being able to turn to a fully kitted out machine shop and knowledgeable volunteers for the manufacture of the myriad of parts that go into a loco - a saving that will help toward the cost of the boiler.

    An alternative possibility - and I must stress that this is a hypothetical situation and that I do not speak for the 82045 group, which I am using as an example, in any way - they could conceivably contract the building of the boiler for their locomotive to the SVR, and pay in whole or more likely in part with a contractual agreement for x number of days provided for the SVR's use of 82045 at no charge. Whilst this would leave them short for the first overhaul, that would perhaps be countered by the interest generated in the locomotive by its operation.

    I reiterate, this is total guesswork on my part as a hypothetical means of financing a newbuild. The above I provide as an example only.
     
  19. Neil_Scott

    Neil_Scott Part of the furniture

    Joined:
    Apr 25, 2008
    Messages:
    3,155
    Likes Received:
    302
    Gender:
    Male
    Occupation:
    Railway servant
    Location:
    Worcester
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I would say that the problem with that theory is that it still requires the SVR to provide the finance up-front for a brand new boiler which would be a challenge for the railway at the moment.
     
  20. 73129

    73129 Part of the furniture

    Joined:
    Sep 24, 2007
    Messages:
    4,500
    Likes Received:
    1,094
    Location:
    Winchester
    So are we saying most of these new builds will become rolling chassisiz but will never progress past this point because there isn't enough capital left to have a boiler constructed or will there be a long stagnant period of time where groups try to finance boiler constructed. I wonder if a boiler construction company would build boilers on a pay has they construct arrangement over a period of years?
     

Share This Page