If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Bridge that Gap: Great Central Railway News

Discussion in 'Heritage Railways & Centres in the UK' started by Gav106, May 8, 2010.

  1. Ploughman

    Ploughman Part of the furniture

    Joined:
    Apr 1, 2008
    Messages:
    5,806
    Likes Received:
    2,649
    Occupation:
    Ex a lot of things.
    Location:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Hope it doesn't breakdown then and need to be replaced.:):)
     
  2. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    2,696
    Likes Received:
    5,502
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    This weekend should see more work on the A60 Bridge as they are due to put the large concrete "caps" on top of the brick abutments I believe.
     
    Johnme101 and J Rob't Harrison like this.
  3. mogulb

    mogulb New Member

    Joined:
    Dec 20, 2010
    Messages:
    125
    Likes Received:
    95
    Phil . Looks like next stage has been put back a week as the next road closure has been rescheduled.
     
  4. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    2,696
    Likes Received:
    5,502
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Thanks for that update Mogulb. I knew that they had originally scheduled to have closures this weekend and next weekend. I also heard that they may be trying to do it all in one weekend so possibly all done next weekend???
     
  5. mogulb

    mogulb New Member

    Joined:
    Dec 20, 2010
    Messages:
    125
    Likes Received:
    95
    Phil. According to one network there is also a closure planned for 18 to 21 November.
     
  6. J Rob't Harrison

    J Rob't Harrison Member

    Joined:
    Nov 6, 2016
    Messages:
    222
    Likes Received:
    316
    Gender:
    Male
    Location:
    Stafford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Looks like the new concrete abutment caps have been fitted to the A60 bridge.

     
  7. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    2,696
    Likes Received:
    5,502
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Thanks for posting that clip J Rob't. It is great to see the progress.
     
  8. Johann Marsbar

    Johann Marsbar Well-Known Member

    Joined:
    Feb 21, 2016
    Messages:
    1,588
    Likes Received:
    1,998
    Gender:
    Male
    Location:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The condensed version of the weekends work has now been put online....

     
  9. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    2,696
    Likes Received:
    5,502
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There was no work being done yesterday (unless they are awaiting it to cure before doing bits?) so I presume it is all ready for the decks to go up on the 19/20th
    IMG20221109110102s.jpg
     
  10. 30854

    30854 Resident of Nat Pres

    Joined:
    Mar 8, 2017
    Messages:
    12,172
    Likes Received:
    11,493
    Gender:
    Male
    Occupation:
    Retired
    Location:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Of interest, what sort of headroom will the highway have beneath the reinstated bridge?
     
  11. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    2,696
    Likes Received:
    5,502
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    "An extra few inches" is said on a GCR press release. The old bridge was stated as 4.3m and I suspect the new one will be 4.4m/4.5m, but we will have to see. The constraints are that the roadway floods and the rail track cannot have a greater gradient coming off from the Midland Main Line up the chord line.
     
  12. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    2,696
    Likes Received:
    5,502
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    This weekend should see the new bridge decks being put on the abutments. It is also the "Last Hurrah Gala" on the GCR with an intensive timetable - including that "lengthy train" of Windcutter 16T minerals operating mid day on Sat and Sunday. In a few years time it will be fantastic to see them going North over the new bridges!
     
  13. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    2,696
    Likes Received:
    5,502
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Work is progressing steadily this weekend and there is a large crane now in place by the A 60 bridge and a lorry, with one of the decks, all ready to be off loaded.
    DSC02141.JPG
     
  14. Johann Marsbar

    Johann Marsbar Well-Known Member

    Joined:
    Feb 21, 2016
    Messages:
    1,588
    Likes Received:
    1,998
    Gender:
    Male
    Location:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
  15. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    2,696
    Likes Received:
    5,502
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    At the A 60 bridge tonight I was told that both decks and the two anti- collision beams are in place. The big crane is being dis-assembled and the grouting etc should be done tomorrow. Then is needs some special matting, signage, ballast and track!
    DSC02156.JPG
     
  16. Johann Marsbar

    Johann Marsbar Well-Known Member

    Joined:
    Feb 21, 2016
    Messages:
    1,588
    Likes Received:
    1,998
    Gender:
    Male
    Location:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
  17. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    2,696
    Likes Received:
    5,502
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Here is my picture, taken today, of the new A60 bridge.
    DSC02159.JPG
     
  18. Miff

    Miff Part of the furniture Friend

    Joined:
    Jun 17, 2008
    Messages:
    2,857
    Likes Received:
    2,793
    Gained 3 inches headroom judging by the new sign on the bridge, compared to the old one at the road side.
     
  19. pmh_74

    pmh_74 Well-Known Member

    Joined:
    Jan 28, 2009
    Messages:
    2,217
    Likes Received:
    1,456
    Yes but life isn't that simple. If you look here:
    https://www.hgvalliance.com/Helpful-Guides/bridge-strike/low-bridge-finder/uk
    The bridge was already shown as 14'6" - maybe one of the reasons there were so many bridge strikes?
    So in effect the height gained is just to put the bridge where the HGV drivers already thought it was.
    I seem to recall someone telling me there were 14'6" signs further out as well (although I haven't confirmed this personally). So I suspect that 3" had been lost to road re-surfacing over the years.
     
    Miff likes this.
  20. Vulcan Works

    Vulcan Works Member

    Joined:
    Apr 12, 2018
    Messages:
    261
    Likes Received:
    711
    Gender:
    Male
    Location:
    England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That does look like a fine piece of civil engineering. I’ve said it before, the scale and complexity of the GCR’s works would be a challenge for much larger organisations so I can only assume that the GCR has some some decent civil engineers or project managers in its ranks!
     