If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Project Wareham

Discussion in 'Heritage Railways & Centres in the UK' started by David R, Jul 31, 2015.

  1. M59137

    M59137 Well-Known Member

    Joined:
    Sep 23, 2009
    Messages:
    1,337
    Likes Received:
    2,143
    Gender:
    Male
    Occupation:
    Carriage & Wagon
    Location:
    Sheringham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    How would an overhaul of a Class 117 engine or gearbox be different on a mainline registered example from a preserved one?

    After the various BR works closed their railcar divisions in the 1990's, us preservationists were actually being approached by the mainline companies (such as First North Western and Chiltern) who were sometimes at a loss, asking which companies we were using to overhaul said components!

    There are even a few examples where preserved groups have overhauled components and supplied them back to the mainline scene.

    Folks would be forgiven for thinking there's a special set of companies or specialists doing "super overhauls" on components intended for mainline ticketed vehicles. The reality for first generation DMU's is that there isn't, the same suppliers are supplying both mainline and preserved operators.

    Sent from my moto g(8) power using Tapatalk
     
    Jamessquared likes this.
  2. Rumpole

    Rumpole Part of the furniture

    Joined:
    Dec 17, 2005
    Messages:
    2,569
    Likes Received:
    798
    Occupation:
    Tea-Maker
    Location:
    34105
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Not solely, we did run into the Up platform on occasion. Both platforms at Wareham can be used for a terminating Swanage service.
     
    Morris_mad likes this.
  3. Andy Moody

    Andy Moody Member

    Joined:
    Jul 9, 2007
    Messages:
    501
    Likes Received:
    342
    Occupation:
    Retired
    Location:
    71B ex 71A
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The WCRC drivers sign the route to Weymouth. Obviously if an incoming charter for Swanage encountered a points failure, then I suppose it could be diverted to Weymouth.
    However If there was a points failure at Worgret, The DMMU would not be able to enter on to the main line in the first place, On the basis that it would be the next train to depart Wareham, the points would remain set for the branch.
     
  4. Rumpole

    Rumpole Part of the furniture

    Joined:
    Dec 17, 2005
    Messages:
    2,569
    Likes Received:
    798
    Occupation:
    Tea-Maker
    Location:
    34105
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That all depends on what's in the area for Dorset Coast to deal with (and whatever SWR decide to do with their timetable in due course!). One of the occasions the Up platform was used was due to a charter passing through the Down road while the Swanage service was held, so there have been times that the points at Worgret have required to be swung while the Swanage service was on the main.
     
    Last edited: Feb 15, 2022
  5. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    Joined:
    Oct 2, 2015
    Messages:
    6,231
    Likes Received:
    4,993
    Gender:
    Male
    Location:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Now you mention that I seem to remember being a steward on that charter and seeing some unhappy looking photographers on the up platform at Wareham.
     
  6. torgormaig

    torgormaig Part of the furniture Friend

    Joined:
    Jul 17, 2007
    Messages:
    4,460
    Likes Received:
    6,611
    The up platform was used on the day that I visited on Sunday 6/8/2017 - maybe this was normal for a Sunday?
    mini_IMG_3783.JPG

    Peter
     
  7. City of truro fan

    City of truro fan Member

    Joined:
    Nov 29, 2015
    Messages:
    784
    Likes Received:
    86
    Gender:
    Female
    Location:
    Honiton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The best options is that a new station could be built at the sidings so the train can get right out the way. This would be better for brake downs then as the heritage train would be more likely to do this and it wouldn’t have to be toad out the way of the main line platforms. It a shame there never enough room for 2 lines like Eridge or somewhere else where ethics happens so they can just keep right out the way
     
  8. Woof Mk2

    Woof Mk2 Member

    Joined:
    Oct 26, 2015
    Messages:
    290
    Likes Received:
    218
    Gender:
    Male
    Location:
    Padstow
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It has been advised that
    Work on the shed construction was suspended for the duration of the pandemic and was anticipated to restart in January 2022. However, with late surges in Omicron and other factors a decision was taken to postpone the restart and to reconsider the plan to complete the work.
    It is planned that completion will be in January 2023.
     
  9. MellishR

    MellishR Resident of Nat Pres Friend

    Joined:
    Apr 16, 2009
    Messages:
    8,136
    Likes Received:
    5,216
    I was aware of that but assuming that there would be a lot of older stock that does have tyres still in use in some places around the world. Or was it only large diameter steam loco wheels that ever needed to be made with separate centres and tyres?
     
  10. gwalkeriow

    gwalkeriow Well-Known Member

    Joined:
    Aug 17, 2009
    Messages:
    1,704
    Likes Received:
    1,728
    Gender:
    Male
    Occupation:
    Retired.
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The vast majority of wheelsets were fitted with tyres, from my experience the most common exceptions were wheelsets for wagons.
     
  11. mdewell

    mdewell Well-Known Member Friend

    Joined:
    Mar 23, 2005
    Messages:
    1,676
    Likes Received:
    2,580
    Occupation:
    UK & Ireland Heritage Railways Webmaster
    Location:
    Ruabon, Wrexham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Was it you who had the big win on the EuroMillions Lottery last week? If not, then I guess we'll have to wait for someone else to find the money to impliment this and all your other very expensive suggestions. :)
     
  12. 30854

    30854 Resident of Nat Pres

    Joined:
    Mar 8, 2017
    Messages:
    12,172
    Likes Received:
    11,493
    Gender:
    Male
    Occupation:
    Retired
    Location:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Any idea if 'unfitted' status was anything to do with that?

    For some odd reason, that brings to mind an old image of a very heavy well wagon, with four multi-wheeled bogies, the outer pair of bogies connected to the inner pair with two thumping great "inverted bow" cantilevers. IIRC, it was a design for transporting large heavy castings in the north east ... something to do with turbines, I think. It was certainly by far the largest item of UK freight stock I've ever seen and about as far removed from an unbraked 5t loose coupled coal wagon as it's possible to imagine.

    Finally!! Just found a (pretty indifferent) image:

    download.jpeg-16.jpg

    [Credited to railwaywondersoftheworld.com rather than the 1950s book I saw it in!)
     
  13. 80104

    80104 Member

    Joined:
    Nov 19, 2020
    Messages:
    689
    Likes Received:
    467
    Location:
    a small town in germany
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Reinstate the bay platform on the downside. DC to compulsory purchase the industrial estate in Johns Road and build a new car park. OR reinstate the bay platform on the upside (newts, lizards and NR cabinet notwithstanding).
     
  14. DcB

    DcB Well-Known Member

    Joined:
    Jun 5, 2018
    Messages:
    1,370
    Likes Received:
    423
    Location:
    Surrey
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Or as Andy said the use of existing Wareham platforms worked in 2017 and there is no reason it will not work again in 2022?
    Ideally joint tickets should be used so passengers changing do not have to leave platforms and a separate ticket office is not needed at Wareham.
    But with so much paperwork, funding and other things to sort, wonder if it will start in May?
     
    Last edited: Feb 16, 2022
    oliversbest likes this.
  15. Dunfanaghy Road

    Dunfanaghy Road Well-Known Member

    Joined:
    Oct 9, 2019
    Messages:
    1,261
    Likes Received:
    1,569
    Gender:
    Male
    Occupation:
    Retired
    Location:
    Alton, Hants
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Small wheels, small tyres, low heat absorbtion when braking. The big worry is tyres slipping on the wheel plate, which heat obviously makes more likely (hence the splashes of white paint on the circumference of tyred wheels).
    Pat
     
  16. buzby2

    buzby2 Well-Known Member

    Joined:
    Mar 26, 2009
    Messages:
    1,626
    Likes Received:
    537
    Location:
    Swanage
    As mentioned earlier - if the imperial (original spec) sized bearings had been changed to metric then that would have to have been reviewed and approval gained beforehand - no doubt after much time and money spent on expert reports, etc.
    So far as I recall, the original steel specification for new tyres is no longer produced in this country and the only supplier approved for use on UK main lines is based in South Africa.
    I think it fair to say that trying to meet current UK main line requirements with equipment this old has not been a piece of cake. I suspect it has come as something of a culture shock for those having to make the decisions over the past few years when bureaucratic and other 'hurdles' kept coming. I for one am glad it didn't involve me.
     
  17. Alan Kebby

    Alan Kebby Well-Known Member

    Joined:
    Sep 18, 2019
    Messages:
    1,173
    Likes Received:
    1,223
    Gender:
    Male
    Location:
    Brighton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I don’t think it was originally envisaged the bearings would be such a problem, as a supplier existed able to make them to the required imperial size.

    The problems came because it was a very small order to a non standard size. So the supplier gave it a very low priority.
     
  18. City of truro fan

    City of truro fan Member

    Joined:
    Nov 29, 2015
    Messages:
    784
    Likes Received:
    86
    Gender:
    Female
    Location:
    Honiton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It seem a waste they spend all the money getting steam engines ready to go in the main line to as they don’t use it for that. The money could have gone in the diesels and making them ready so at leas they could run a main train.
     
  19. Andy Moody

    Andy Moody Member

    Joined:
    Jul 9, 2007
    Messages:
    501
    Likes Received:
    342
    Occupation:
    Retired
    Location:
    71B ex 71A
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Translation please?
     
  20. Bertie Lissie

    Bertie Lissie New Member

    Joined:
    Dec 10, 2012
    Messages:
    58
    Likes Received:
    138
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I’m not sure translation is available for Honitonese.
     
    weltrol, marshall5 and Sunnieboy like this.

Share This Page