If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

GCR 8K/LNER 04 63601

Discussion in 'Steam Traction' started by Flying Phil, Aug 16, 2021.

  1. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    2,696
    Likes Received:
    5,502
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    This locomotive, owned by the NRM, is undergoing its second major overhaul at Loughborough. The boiler has been removed and sits outside the shed.
    The chassis has been stripped. The crank axle had been badly worn on the eccentric sheaves and a new axle is being made. Here is a picture of the chassis in Lbro shed yesterday.
    DSC00880.JPG
     
    Will RL, Johnme101, Kylchap and 4 others like this.
  2. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    2,696
    Likes Received:
    5,502
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I have found a couple of pictures showing the locomotive after its first return to Steam at L' bro.....and a youthful Craig Stinchcombe! 2019-10-07_20 04 new.JPG 2019-10-07_23 04 + Craig.JPG
     
    clinker, Will RL, Johnme101 and 4 others like this.
  3. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    2,696
    Likes Received:
    5,502
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The boiler has been moved from the low flat wagon and is on it's side, being worked on, outside Lbro shed. The driving wheels were being cleaned and the frames have been painted.
     
  4. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    2,696
    Likes Received:
    5,502
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The front tubeplate of the inner firebox has been removed from the boiler. However it appeared to be riveted to the rest of the inner firebox. Obviously such rivets can be drilled out to remove them, but how can they be put back if the inner firebox is still in place?
    DSC01027.JPG
     
    Richard Roper and Johnme101 like this.
  5. Richard Roper

    Richard Roper Well-Known Member

    Joined:
    May 22, 2006
    Messages:
    1,310
    Likes Received:
    1,355
    Gender:
    Male
    Occupation:
    Librarian
    Location:
    Just up the road from 56E Sowerby Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Deleted.
     
    Last edited: Nov 17, 2021
  6. LMS2968

    LMS2968 Part of the furniture

    Joined:
    Sep 1, 2006
    Messages:
    2,987
    Likes Received:
    5,084
    Gender:
    Male
    Occupation:
    Lecturer retired: Archivist of Stanier Mogul Fund
    Location:
    Wigan
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Patch screws. These are inserted from the fire side into threaded holes, then the square end cut off and the head peened over.

    [​IMG]

    [​IMG]
     
    clinker, banburysaint, ragl and 3 others like this.
  7. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    2,696
    Likes Received:
    5,502
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Thanks for the explanation - I hadn't realised that there would be sufficient strength for a screwed fixing to be used with just the thread in the inner firebox side sheet.
     
  8. andalfi1

    andalfi1 Well-Known Member

    Joined:
    Nov 5, 2008
    Messages:
    1,006
    Likes Received:
    466
    Gender:
    Male
    Occupation:
    Semi Retired.
    Location:
    Haworth
    Heritage Railway Volunteer:
    Yes I am an active volunteer
     
  9. LMS2968

    LMS2968 Part of the furniture

    Joined:
    Sep 1, 2006
    Messages:
    2,987
    Likes Received:
    5,084
    Gender:
    Male
    Occupation:
    Lecturer retired: Archivist of Stanier Mogul Fund
    Location:
    Wigan
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I'm not a boiler smith so don't know, but shear head bolts are used in the motor industry as you say. But those heads look a little too substantial to me to be sheared off like that without stripping threads in the copper plate.
     
  10. andalfi1

    andalfi1 Well-Known Member

    Joined:
    Nov 5, 2008
    Messages:
    1,006
    Likes Received:
    466
    Gender:
    Male
    Occupation:
    Semi Retired.
    Location:
    Haworth
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Looking closely at the photos, there is a machined groove where the square joins the head which, could be a tell tale of a torque limiting measure as a shear groove.
     
  11. LMS2968

    LMS2968 Part of the furniture

    Joined:
    Sep 1, 2006
    Messages:
    2,987
    Likes Received:
    5,084
    Gender:
    Male
    Occupation:
    Lecturer retired: Archivist of Stanier Mogul Fund
    Location:
    Wigan
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yep - agree!
     
    andalfi1 likes this.
  12. Cosmo Bonsor

    Cosmo Bonsor Member

    Joined:
    Dec 10, 2014
    Messages:
    221
    Likes Received:
    500
    Gender:
    Male
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Patch screws in a lap joint is a routine repair.

    The steel rivets are gas cut out in alternate holes. It's dead easy because you can't easily damage the copper plate. This keeps the plates tight together, you wouldn't punch them out.
    You then tap a thread 11 tpi Whit form at what ever diameter gives you a full form thread. The adjacent numbers in the pic are almost certainly the size of the hole.
    Next countersink the hole. From memory its 60 deg for a copper screw and 80 deg for a steel one, but I might have miss remembered that detail. There has to be a couple of threads in the water side too.
    Drive the screw in using the square. I put a few stokes of a saw cut on the undercut. Tighten it until the square wrings off. I think I might have used some Stag on the threads, it smells of pine smoke.
    Then caulk the screw head into the plate. Use a clockwise motion on the tool to tighten the screw as you do it. Try not to undercut or groove the plate.
    Rinse and repeat. Easy peasy.
    I've done loads. Not any more thankfully.

    Edit: Spelling, added more info.
     
    Last edited: Nov 17, 2021
    ragl, andalfi1, Steve and 1 other person like this.
  13. Steve

    Steve Resident of Nat Pres Friend

    Joined:
    Oct 7, 2006
    Messages:
    11,930
    Likes Received:
    10,088
    Occupation:
    Gentleman of leisure, nowadays
    Location:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It's 80 deg for copper and 60 deg for steel, but it is relative to the plate material and not the patch screw. You tap both plates if they are copper but only the underside plate if they are steel. More info in the HRA guidance note for those interested:
    https://static1.squarespace.com/sta...1511180393068/HGR-B9025-Is01-Patch+Screws.pdf
    The GWR developed means of riveting seams with the firebox in situ using long tongs and wedges and this was copied by the LMS when Stanier went to them. I believe this is practiced on the Severn Valley but, although I've been shown the necessary tools, I've never seen it done. It is described in the HRA guidance note on riveting:
    https://static1.squarespace.com/sta...29/HGR-B9023-Is01-Steel+Rivets+&+Riveting.pdf
     
    Bluenosejohn likes this.
  14. LMS2968

    LMS2968 Part of the furniture

    Joined:
    Sep 1, 2006
    Messages:
    2,987
    Likes Received:
    5,084
    Gender:
    Male
    Occupation:
    Lecturer retired: Archivist of Stanier Mogul Fund
    Location:
    Wigan
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The photos are of 2968's firebox under repair on the Severn Valley, 26 July 2020.
     
    Richard Roper likes this.
  15. Cosmo Bonsor

    Cosmo Bonsor Member

    Joined:
    Dec 10, 2014
    Messages:
    221
    Likes Received:
    500
    Gender:
    Male
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes, you are right.
    I knew I'd forgotten some details.
    It's been the best part of 10 years since I did a lot of boiler work, I'm glad to say.
     
  16. daveannjon

    daveannjon Well-Known Member

    Joined:
    Mar 31, 2006
    Messages:
    1,059
    Likes Received:
    372
    Location:
    Waiting for the Right Away
    Is the NRM funding the work at all?

    Dave
     
  17. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    2,696
    Likes Received:
    5,502
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Re the NRM, I've heard of no details, but I'm sure there will be a contract between the GCR and NRM which probably involves NRM financing some materials, GCR funding work time and running on GCR for a certain no of months/years....but it is no doubt "commercially sensitive"!
     
  18. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    2,696
    Likes Received:
    5,502
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    DSC01173.JPG Here is a closer picture of the front of the firebox inside.
     
    ragl, Richard Roper and Johnme101 like this.
  19. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    2,696
    Likes Received:
    5,502
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    According to the latest "Main Line" magazine (#190) the foundation ring is life expired and will be replaced by a new one (casting or fabrication?)
     
  20. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    2,696
    Likes Received:
    5,502
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Some work is being done on the frames and it looks like the axleboxes are being re-white metalled. There is no sign of the fourth pair of driving wheels and axle ( A new axle has had to be manufactured and machined for the slide valve eccentrics.).
    DSC01540ss.jpg
     

Share This Page