If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Locos that didn't even qualify as a 'might have been', but really deserved preservation

Discussion in 'Steam Traction' started by Martin Perry, May 24, 2020.

  1. sir gilbert claughton

    sir gilbert claughton Well-Known Member

    Joined:
    Jan 17, 2017
    Messages:
    1,061
    Likes Received:
    511
    Gender:
    Male
    Occupation:
    retired
    Location:
    east sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Mrs Craven
     
    andrewshimmin and Richard Roper like this.
  2. bluetrain

    bluetrain Well-Known Member

    Joined:
    Mar 3, 2019
    Messages:
    1,326
    Likes Received:
    1,460
    Gender:
    Male
    Location:
    Wiltshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Tom - There were certainly other cases of awkwardly-sited locomotive works. Two that come to mind are the LYR works at Miles Platting,
    re-located in the 1880s to a green-field site at Horwich, and the GNSR at Kittybrewster, re-located in the early 1900s to Inverurie. Among private loco builders, Sharp Stewart re-located in the late 1880s from Manchester to Glasgow for similar reasons.

    Back to the topic of this thread, you have identified in other posts that, while the Southern and its constituents are fairly well represented in preservation, there are shortfalls for the pre-1900 SECR and for the later LBSC. Perhaps this trio of 0-6-0 tanks would have helped cover those gaps:

    http://www.semgonline.com/steam/r-r1class-ser_01.html
    http://www.semgonline.com/steam/tclass_01.html
    http://www.semgonline.com/steam/e2_class.html

    Although in respect of the last entry, there is the risk of argument with those who believe that Mr Billinton copied the design from Rev'd Awdry.
     
    andrewshimmin likes this.
  3. LesterBrown

    LesterBrown Member

    Joined:
    Jan 20, 2009
    Messages:
    995
    Likes Received:
    761
    Location:
    Devon
    To access the works a locomotive had first to be turned on a turntable located on the main running line, then pulled across the road linking Cardiff town centre with the docks, next pushed onto the yard turntable and manually manoeuvred into the yatd using heelbars. If it was one of the typical 0-6-2Ts the rear of the locomotive next had to be lifted in the overhead crane shop so the trailing wheels could be rolled out reducing the wheelbase before it was moved back onto the turntable then onto a traversing table which its coupled wheelbase was now just short enough to fit on, it then had to be moved through the rear of the crane shop onto a second traversing table giving access to the main part of the works.
    [​IMG]
     
    jnc, andrewshimmin, ragl and 7 others like this.
  4. Spamcan81

    Spamcan81 Nat Pres stalwart

    Joined:
    Aug 25, 2007
    Messages:
    35,121
    Likes Received:
    20,772
    Occupation:
    Training moles
    Location:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    In its original GNR form I hope.
     
    5944 and Jamessquared like this.
  5. Spamcan81

    Spamcan81 Nat Pres stalwart

    Joined:
    Aug 25, 2007
    Messages:
    35,121
    Likes Received:
    20,772
    Occupation:
    Training moles
    Location:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I enjoyed his appearances on Newsround and Country File.
     
  6. Spamcan81

    Spamcan81 Nat Pres stalwart

    Joined:
    Aug 25, 2007
    Messages:
    35,121
    Likes Received:
    20,772
    Occupation:
    Training moles
    Location:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Quite straightforward then. :)
     
  7. clinker

    clinker Member

    Joined:
    Oct 8, 2016
    Messages:
    569
    Likes Received:
    348
    Gender:
    Male
    Location:
    romford
    Heritage Railway Volunteer:
    No I do not currently volunteer



    So this was a railway works without a rail connection?
     
  8. torgormaig

    torgormaig Part of the furniture Friend

    Joined:
    Jul 17, 2007
    Messages:
    4,440
    Likes Received:
    6,546
    That's an idea that'll never catch on!:)

    Peter
     
  9. ghost

    ghost Part of the furniture

    Joined:
    May 29, 2006
    Messages:
    3,967
    Likes Received:
    5,064
    Gender:
    Male
    Location:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Swanage/SLL has made it work for quite a few years now. Hate to think how much it's costing them to move locos in/out by low loader though!

    Keith
     
  10. Jamessquared

    Jamessquared Nat Pres stalwart

    Joined:
    Mar 8, 2008
    Messages:
    26,100
    Likes Received:
    57,416
    Location:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Herston works?

    Tom
     
  11. Jamessquared

    Jamessquared Nat Pres stalwart

    Joined:
    Mar 8, 2008
    Messages:
    26,100
    Likes Received:
    57,416
    Location:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I will never say Brighton works had a poor layout again!

    What’s interesting in that description is not only the awkward access, but also that it put a constraint on the size of locos - essentially the railway could never build a bigger loco than would fit on the traversed, essentially a modest-sized 0-6-2T.

    Tom
     
    andrewshimmin and Richard Roper like this.
  12. Jimc

    Jimc Part of the furniture

    Joined:
    Sep 8, 2005
    Messages:
    4,052
    Likes Received:
    4,665
    Occupation:
    Once computers, now part time writer I suppose.
    Location:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I've seen it said that its why the TVR stopped building their own locomotives and went exclusively to buying them.
     
    andrewshimmin likes this.
  13. 30854

    30854 Resident of Nat Pres

    Joined:
    Mar 8, 2017
    Messages:
    12,172
    Likes Received:
    11,493
    Gender:
    Male
    Occupation:
    Retired
    Location:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    You should look at old photos of Dundalk (GNRI), which had a similarly cramped transverse arrangement, and was no small part of why that line developed such a famously excellent stud of 4-4-0s ... nowt bigger fitted!
     
    andrewshimmin likes this.
  14. torgormaig

    torgormaig Part of the furniture Friend

    Joined:
    Jul 17, 2007
    Messages:
    4,440
    Likes Received:
    6,546
    Indeed - not forgetting Ian Rileys works at Heywood, nor the NYMR's C&W facility at Kirby Misperton.

    Some daft ideas never catch on:)

    Peter
     
    Jamessquared likes this.
  15. 5944

    5944 Resident of Nat Pres

    Joined:
    Jan 14, 2006
    Messages:
    8,031
    Likes Received:
    7,605
    Gender:
    Male
    Occupation:
    Train Maintainer for GTR at Hornsey
    Location:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Not some silly little 0-4-2T from Swindon? Phew!
     
    andrewshimmin and Spamcan81 like this.
  16. Steve

    Steve Resident of Nat Pres Friend

    Joined:
    Oct 7, 2006
    Messages:
    11,930
    Likes Received:
    10,088
    Occupation:
    Gentleman of leisure, nowadays
    Location:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Is this it?
    Taff Vale Works.jpg
     
    ragl, Bluenosejohn and LesterBrown like this.
  17. Jimc

    Jimc Part of the furniture

    Joined:
    Sep 8, 2005
    Messages:
    4,052
    Likes Received:
    4,665
    Occupation:
    Once computers, now part time writer I suppose.
    Location:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Think so, yes. West Yard was the name.
     
  18. LesterBrown

    LesterBrown Member

    Joined:
    Jan 20, 2009
    Messages:
    995
    Likes Received:
    761
    Location:
    Devon
    It certainly explains why their largest and most modern design, the A class retained the short wheelbase of the first 0-6-2Ts. Whereas the Rhymney with a large modern works at Caerphilly (though unlike the TVR they didn't construct new locos there) could build the much better proportioned 0-6-2Ts which the GWR copied the leading dimensions for the 5600s.
     
  19. LesterBrown

    LesterBrown Member

    Joined:
    Jan 20, 2009
    Messages:
    995
    Likes Received:
    761
    Location:
    Devon
    In 1839, when the line was still under construction being alongside a canal dock (later filled in to expand the works) accessible to small sailing vessels was useful and at that time coal was transferred by wheelbarrow into ships at the same wharf. When the company only had six locomotives and there was little development at the end of Bute Street it would all have seemed quite adequate. It was indeed the lack of space which led to the Taff Vale to cease new loco construction and by the time the fleet had grown to 275 a new works was planned at Radyr on the north west outskirts of Cardiff. The GWR instead decided to greatly expand Caerphilly instead, opening the new workshops there in 1926 and closing West Yard.

    West Yard.jpg

    Also note the tram lines in Bute Street, the works was behind the buildings to the right in this model of Bute Road station. Photos show locomotives rather than horses being used to get locos in, but the awkward turntables arrangement required 3 locos in steam to get one cold loco into the works.
     
    andrewshimmin, ragl and Bluenosejohn like this.
  20. Jamessquared

    Jamessquared Nat Pres stalwart

    Joined:
    Mar 8, 2008
    Messages:
    26,100
    Likes Received:
    57,416
    Location:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It’s probably worth having infrastructure photos like the one above to hand to counter the periodic cries of “why did company x continue building such locomotives when other - normally French or US railways :rolleyes: - were building much larger. Length of turntables was another constraint, and I can think of at least one large express passenger loco that was stymied by virtue of available turntable size.

    Tom
     
    jnc, andrewshimmin, 35B and 2 others like this.

Share This Page