If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Lynton and Barnstaple - Operations and Development

Discussion in 'Narrow Gauge Railways' started by 50044 Exeter, Dec 25, 2009.

  1. 30854

    30854 Resident of Nat Pres

    Joined:
    Mar 8, 2017
    Messages:
    12,172
    Likes Received:
    11,493
    Gender:
    Male
    Occupation:
    Retired
    Location:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Still 'doable' ..... ruddy expensive and certainly not 'the preferred option', but not completely impossible. I guess it'd come down to how important to the local economy the revived L&B is, by the time the question arises.

    Why does Blackmoor bring the situation surrounding the Strathspey Railway's Granton extension to mind?
     
  2. 35B

    35B Nat Pres stalwart

    Joined:
    Jun 18, 2011
    Messages:
    25,493
    Likes Received:
    23,725
    Gender:
    Male
    Location:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I don't follow the parallel.
     
  3. ghost

    ghost Part of the furniture

    Joined:
    May 29, 2006
    Messages:
    3,967
    Likes Received:
    5,064
    Gender:
    Male
    Location:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I seem to recall that a loop is planned at Parracombe in the current plans.

    Keith
     
  4. 30854

    30854 Resident of Nat Pres

    Joined:
    Mar 8, 2017
    Messages:
    12,172
    Likes Received:
    11,493
    Gender:
    Male
    Occupation:
    Retired
    Location:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Both involve alignments requiring very expensive road bridges. The StrathRly is currently awaiting something resembling action from some combination of Local Authority, Highways and ScotParl, which keeps getting kicked into the long grass.

    Hopefully, the LA and NatParks folks in Devon are more positively inclined to action than their Scottish counterparts.

    Edit: best clarify, I'm speaking of any putative future return to the historic alignment at this point.
     
    Last edited: Nov 12, 2019
    35B likes this.
  5. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    Joined:
    Apr 15, 2006
    Messages:
    16,510
    Likes Received:
    7,753
    Location:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    https://www.transport.gov.scot/projects/a95-gaich-to-craggan-section-improvements/
     
  6. 30854

    30854 Resident of Nat Pres

    Joined:
    Mar 8, 2017
    Messages:
    12,172
    Likes Received:
    11,493
    Gender:
    Male
    Occupation:
    Retired
    Location:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I note it's status is 'in preperation' and there's nowt stated beyond the pretty general aspiration. IIRC, something rather more complete was on the table a few years ago, before one or more of the funding bodies got cold feet (which I think was down to the financial plug being pulled, further up the food chain). This ongoing saga reached the 'I'll believe it when I see it' stage some time ago!
     
  7. ross

    ross Well-Known Member

    Joined:
    May 18, 2017
    Messages:
    1,002
    Likes Received:
    2,477
    Gender:
    Male
    Location:
    Titfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Astronomical? I thought so too, but based on what? I agree that the sum we've heard bandied about was indeed a very big number-far far more than anyone would wish to pay for a building which could be converted into a railway station.
    For a comparison, the following premises are for sale:
    The Forest Inn, Hexworthy -£ 795,000
    The Landmark, South Pool -£500,000-£1,000,000
    A pub/restaurant at Nomansland, Lynton -£895,000

    These are all on the market at the moment, in the area, and one presumes reflect the market value of a business with good turnover and attractive premises and location. Also bear in mind that the owners of these premises want to sell, for whatever reason.
    Meatman, my apologies for quoting you. You've voiced an opinion a lot of people have, please don't take this as any sort of personal slight. I merely seek to bring more information to the discussion.
     
    H Cloutt likes this.
  8. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    Joined:
    Apr 15, 2006
    Messages:
    16,510
    Likes Received:
    7,753
    Location:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Must admit that I hadnt looked at it for a while, but was under the impression that it had been 'in preparation' for a long time and opinion was that all the money had gone on the Aberdeen by-pass (A fine road!).
     
  9. johnofwessex

    johnofwessex Resident of Nat Pres

    Joined:
    Apr 6, 2015
    Messages:
    9,185
    Likes Received:
    7,226
    Gender:
    Male
    Occupation:
    Thorn in my managers side
    Location:
    72
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Of course the real issue is what would it fetch as a house, because in many cases thats what drives the value of business premises - much of course to the detriment of the business
     
    SpudUk likes this.
  10. ross

    ross Well-Known Member

    Joined:
    May 18, 2017
    Messages:
    1,002
    Likes Received:
    2,477
    Gender:
    Male
    Location:
    Titfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Only in cases where the business is not doing so well- not the matter in this particular case.
    Interesting point though- most old station buildings are simply attractive buildings, and have a further draw to railway enthusiasts because they are old railway buildings. 30 years ago, many enthusiasts would have been delighted to pay a premium to live in an old Lynton and Barnstaple Railway station. Today, most of us enthusiasts would far rather see this particular building as a station on a restored L&B, which takes us out of the market....
     
    30854 and nine elms fan like this.
  11. Meatman

    Meatman Member

    Joined:
    Apr 10, 2018
    Messages:
    616
    Likes Received:
    1,401
    Gender:
    Male
    Location:
    Burrington,devon
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As i said in an earlier post, as stated in a letter by the pubs solicitors, at a meeting between the pubs owners and the Trust where the chairman of the Trust was present, a representative of the Trust said a compulsory purchase order would be used if necessary, maybe not bully boy tactics but definitely unnecessary in such negotiations, also as another member has stated, a loop is planned at Parracombe in the long term so no reason why the line cannot be extended to there, this would possibly increase foot visitors to Parracombe but I can't see that would be a bad thing, as for the park and ride scheme, I can't see that being fully effective until the line actually reaches Lynton and I feel once people realise the train would only go as far as Woody Bay and then they would be bussed to Lynton they would probably just drive to Lynton anyway, especially if they are a young family, so in that respect maybe phase 2b should have been considered first, a park and ride from Woody Bay to Lynton might have been more practical to relieve the traffic into Lynton but as it stands the planning is back to Blackmoor gate and if the purchase of the pub is at present in doubt something needs to be done to keep supporters interested in the project, you can only keep asking for donations for so long before people want to see something on the ground, it's a big jump to get back to Blackmoor gate in one hit, at least to head for Parracombe would raise supporters spirits, slowly slowly catchy monkey as they said
     
  12. 30854

    30854 Resident of Nat Pres

    Joined:
    Mar 8, 2017
    Messages:
    12,172
    Likes Received:
    11,493
    Gender:
    Male
    Occupation:
    Retired
    Location:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Re: Lynton. Mention was made of extending the original alignment to gain a more favourable location for the terminus (though presumably still some way above the village proper). Whether such a scheme is implemented, or restoration of the former site to be possible (which seems unlikely at present), some transfer arrangement, probably beyond the capacity of the existing historic Cliff Lift, to access one or both of the twin villages would seem essential. Is any clarification yet possible concerning the current thinking regarding this?
     
    H Cloutt and SpudUk like this.
  13. H Cloutt

    H Cloutt Member

    Joined:
    Dec 22, 2018
    Messages:
    884
    Likes Received:
    1,329
    Gender:
    Male
    Location:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Planning application. I notice that the application is now being discussed by the planning committee rather than being decided by officers. Probably wise in view of the number of objections. The council will be aware that most of the objections are a standard letter even though the content of this letter has been modified as time goes on. Most of these mistakenly seem to think that the proposal is to shut the pub, even though the L and B website clearly states that this is not the intention. Since this is a reapplication of an expired application it is difficult to see how the council can turn it down especially in view of planning policies REC4 [protection of former railway routes] and BAR16 [reinstatement of L &B railway].
    Parracombe. From what I can see the planning consent [from a different authority] for the reinstatement up to Blackmoor Gate has a condition that the line cannot be reinstated until the Trust own all the land and that funds are in place. Since there appear to be two sections of the trackbed which the Trust do not yet own then this condition would prevent the reinstatement to Parracombe [where the trust own the land] being the half way point on the section to Blackmoor until there is a change of ownership.
    TWAO. I notice from the public area of the Website that there was an exhibition and Public Consultation Days last weekend. I wonder just how many of the objectors turned up to the event. No doubt when the application goes in we will be asked to write in support.
     
    Kempenfelt 82e likes this.
  14. Mark Thompson

    Mark Thompson Well-Known Member

    Joined:
    Sep 10, 2017
    Messages:
    1,430
    Likes Received:
    3,560
    Gender:
    Male
    Location:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    One of the conditions of planning permission being granted, was that at no time was Parracombe to be used as a terminus, temporary or otherwise. That is non- negotiable.
    I thought we all knew this.
     
    SpudUk likes this.
  15. Mark Thompson

    Mark Thompson Well-Known Member

    Joined:
    Sep 10, 2017
    Messages:
    1,430
    Likes Received:
    3,560
    Gender:
    Male
    Location:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    H Cloutt, 30854, big.stu and 2 others like this.
  16. Meatman

    Meatman Member

    Joined:
    Apr 10, 2018
    Messages:
    616
    Likes Received:
    1,401
    Gender:
    Male
    Location:
    Burrington,devon
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    oh dear,if thats the case then options must be running out,all the negativity towards the railway after last weeks Blackmoor debacle will surely feed Louise's fire, especially seeing that she and the pub owners have the same solicitors and im sure she isn't going to give up her section of track bed without a fight and the talk of compulsory purchase was the cause of last weeks issues,i think we all knew it was going to be a long process but it doesn't look like there's going to be any light on the horizon for a very long time,i just hope im proved wrong
     
  17. Mark Thompson

    Mark Thompson Well-Known Member

    Joined:
    Sep 10, 2017
    Messages:
    1,430
    Likes Received:
    3,560
    Gender:
    Male
    Location:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Looking back over the last few pages of this thread, the general theme seems to have much in common with current British politics, in that a huge amount of heat has been generated, whilst any light appears at best to be refracted and contradicted to the point of being nigh incomprehensible. Social media really can be a great means of creating confusion, suspicion and uncertainty.
    The planning committee meeting will be interesting, to say the least, especially if more contradictory evidence is presented.
    Should the railway's interests prevail, it's quite possible that the TWAO will be the only place that genuine "Cut Through" finally occurs, and we all get to know what has actually been occurring here.
     
    MuzTrem and pete2hogs like this.
  18. Tobbes

    Tobbes Member

    Joined:
    Aug 14, 2010
    Messages:
    869
    Likes Received:
    2,354
    Mark Thompson and Old Kent Biker like this.
  19. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    2,696
    Likes Received:
    5,501
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Very good work on those bridges, I'm sure that when the grass grows they will look even better and part of the scenery. Well Done to all concerned.
     
    H Cloutt, Tobbes and Mark Thompson like this.
  20. H Cloutt

    H Cloutt Member

    Joined:
    Dec 22, 2018
    Messages:
    884
    Likes Received:
    1,329
    Gender:
    Male
    Location:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The consultation period for the Old Station House Inn planning application has now closed. I notice that this is now marked for decision by the Planning Committee but is not on the Agenda for the December meeting. I suppose that the earliest that this can be discussed is the meeting in early January. It will be interesting to see the recommendation from the Planning Officers.
     