    July update now live: http://www.82045.org.uk/news/82045_news-jly26.html
     
    gwalkeriow, Johnme101, std tank i 5 ostalih se sviđa ovo.
  2. gios

    gios Member

    Pridružen(a):
    20. Travanj 2012.
    Poruka:
    390
    Lajkova:
    1,551
  3. brennan

    brennan Member

    Pridružen(a):
    11. Rujan 2016.
    Poruka:
    637
    Lajkova:
    783
    Grad:
    Gloucester
    Heritage Railway Volunteer:
    No I do not currently volunteer
    "On the financial side, we suggested that we are about £130,000 away from funding the completion of the build and another £100,000 of fundraising beyond this to get the loco effectively into service." Why would it need another £100,000 after the build is completed?
     
  4. ghost

    ghost Part of the furniture

    Pridružen(a):
    29. Svibanj 2006.
    Poruka:
    4,558
    Lajkova:
    6,331
    Spol:
    Muškarac
    Grad:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    To build up a stock of consumable parts, pay off outstanding loans?
     
    silversteellady se sviđa ovo.
  5. minty4371

    minty4371 New Member

    Pridružen(a):
    3. Kolovoz 2009.
    Poruka:
    161
    Lajkova:
    42
    Spol:
    Muškarac
    Interesi:
    Unemployed
    Grad:
    Sutton Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Maybe to have enough money for when its boiler ticket runs out they know that they can press ahead with the renovation? Or for if it visits other preserved lines? Only my thought (maybe wrong).
     
  6. 35B

    35B Nat Pres stalwart

    Pridružen(a):
    18. Lipanj 2011.
    Poruka:
    33,341
    Lajkova:
    37,000
    Spol:
    Muškarac
    Grad:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Seems likely, not to mention the costs of getting the loco fully commissioned and operable (as opposed, say, to having a signed off boiler certifcate)
     
    silversteellady and ghost like this.
  7. gios

    gios Member

    Pridružen(a):
    20. Travanj 2012.
    Poruka:
    390
    Lajkova:
    1,551
    I don't have the answer to the question of the extra £100.000, only the trustees know. BUT take the comment of 35B above, plus todays spot price of coal/ton, around £500 and the figure seems realistic.
     
    Last edited: 6. Kolovoz 2026.
    ghost se sviđa ovo.
  8. Robin

    Robin Well-Known Member Friend

    Pridružen(a):
    7. Svibanj 2012.
    Poruka:
    1,594
    Lajkova:
    2,292
    Grad:
    Stourbridge
    The Spring 2026 Members' newsletter used the wording "to support the introduction to service and organise the spares provisions for the locomotive". As mentioned at the AGM, to get the locomotive certified and accepted into service requires significant input from the SVR's paid staff among other costs.
     
    gios se sviđa ovo.
  9. Jamessquared

    Jamessquared Nat Pres stalwart

    Pridružen(a):
    8. Ožujak 2008.
    Poruka:
    29,830
    Lajkova:
    73,860
    Grad:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Before Beachy Head entered service, it had about two months of running before it hauled a service train. I don't know precisely how many days / miles it ran, but it was quite a number; it's not beyond the bounds of possibility that if it did 20-30 days running in those two months, it might have burnt 40-50 tons of coal - there's about £16- to £20k to start with, not to mention the associated oil and water. Most of that two month period was done by the Workshop Manager and one of the workshop supervisors (doing the driving / firing and working up the operational instructions). So let's say two paid staff for 2 months; even allowing rather modest salaries in the sector, there could easily be £20k in staff costs (and on-costs) there. If the split between "build" and "get into service" puts the final boiler exam and sign off by the Independent Competent Person, then there are some more thousands there.

    Now obviously you can account for those costs in various ways in terms of how you recharge them between different groups, but it is not too difficult to see how you might run up a significant five-figure bill between the last bolt being tightened, and the bottle of champagne being cracked on the buffer beam on the first day in public traffic.

    Tom
     
    clinker, gios, 35B i 6 ostalih se sviđa ovo.
  10. Bikermike

    Bikermike Well-Known Member

    Pridružen(a):
    11. Ožujak 2020.
    Poruka:
    2,319
    Lajkova:
    2,662
    Spol:
    Muškarac
    Grad:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Snagging, modifications required in the light of testing etc. The problem with making your own engine is you can't send it back to the makers if you don't like it.

    I wonder where final paint comes in the completion?
     
    35B se sviđa ovo.
  11. mdewell

    mdewell Well-Known Member Friend

    Pridružen(a):
    23. Ožujak 2005.
    Poruka:
    2,325
    Lajkova:
    3,828
    Interesi:
    UK & Ireland Heritage Railways Webmaster
    Grad:
    Ruabon, Wrexham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Probably at the end! ;):D

    (Someone had to say it. )
     
  12. northernsteam

    northernsteam Member

    Pridružen(a):
    25. Svibanj 2010.
    Poruka:
    662
    Lajkova:
    345
    Spol:
    Muškarac
    Interesi:
    Used to be in civil engineering, highway bridges.
    Grad:
    Tyne and Wear
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thousands of people will remember Tornado's arrival at Newcastle in primer grey after her mainline test run, so don't worry too much about a coat of paint. Yes, I know this one is not going on the mainline but still needs a complete checkover. A good run out to check nowt falls off works wonders!
     
    Last edited: 6. Kolovoz 2026.
  13. gios

    gios Member

    Pridružen(a):
    20. Travanj 2012.
    Poruka:
    390
    Lajkova:
    1,551
  14. minty4371

    minty4371 New Member

    Pridružen(a):
    3. Kolovoz 2009.
    Poruka:
    161
    Lajkova:
    42
    Spol:
    Muškarac
    Interesi:
    Unemployed
    Grad:
    Sutton Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
  15. Bikermike

    Bikermike Well-Known Member

    Pridružen(a):
    11. Ožujak 2020.
    Poruka:
    2,319
    Lajkova:
    2,662
    Spol:
    Muškarac
    Grad:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    One thing that has fascinated me throughout this build is that, given how much standards were supposed to wear their plumbing on the outside, how much is still tucked under or behind things.
     
  16. gios

    gios Member

    Pridružen(a):
    20. Travanj 2012.
    Poruka:
    390
    Lajkova:
    1,551
    You shouldn't be too surprised when you see the purposes for which the pipework is required! The pipework consists of a network of copper, steel, or brass tubes that safely transport high-pressure steam, water, and compressed air between the boiler, cylinders, and operational accessories. Much is indeed hidden from view, but ineviatably some will be visable.

    it is an interesting point, and can easily be applied to so much more in a Loco build, where many components, and hours of skilled work are not ever seen by the public.
     
  17. std tank

    std tank Part of the furniture

    Pridružen(a):
    20. Rujan 2005.
    Poruka:
    4,052
    Lajkova:
    1,182
    Spol:
    Muškarac
    Interesi:
    Retired
    Grad:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    On 82045 the water delivery pipes to the clack valves pass through the side tanks vertically. Each pipe is protected by a steel tube welded to the top and bottom of the tanks. The steam heat delivery pipe also passes through the tube in the RH tank,
     
    Last edited: 28. Kolovoz 2026.
  18. Sheff

    Sheff Resident of Nat Pres

    Pridružen(a):
    21. Travanj 2006.
    Poruka:
    8,696
    Lajkova:
    4,165
    Spol:
    Muškarac
    Interesi:
    Retired Engineer & Heritage Volunteer
    Grad:
    Leicestershire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    How odd. Iirc on the 4 they follow the underside of the tank?
     
  19. std tank

    std tank Part of the furniture

    Pridružen(a):
    20. Rujan 2005.
    Poruka:
    4,052
    Lajkova:
    1,182
    Spol:
    Muškarac
    Interesi:
    Retired
    Grad:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Correct. We must remember that the 82XXX tanks were designed at Swindon.
     
    Chris86, 5944, Jamessquared i 2 ostalih se sviđa ovo.
  20. Jamessquared

    Jamessquared Nat Pres stalwart

    Pridružen(a):
    8. Ožujak 2008.
    Poruka:
    29,830
    Lajkova:
    73,860
    Grad:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Maunsell had a design philosophy, right back in SE&CR days, of "make everything get-at-able". But you need to think of the context of "before I do (and maybe introduce other design challenges), why might I actually want to get at that thing?"

    So for example, on a vacuum-braked loco with a vacuum pipe, it's got to pass in close proximity to the vacuum cylinder, which on size grounds will be between the frames. But the likelihood you ever have to do any maintenance on the vacuum pipework between heavy overhauls is fairly low, so you gain simplicity, and don't lose much utility, by placing it between the frames. On the other hand, a piston and valve exam will probably take place every 20-25,000 miles or so - perhaps every few months for a heavily-worked loco - so it makes sense to design your loco such that the pistons and valves can be removed with the minimum amount of disassembly: compare how easy that is to do on a BR Standard relative to locos of a much earlier generation. Or look at whether the design of your superheater header allows ready replacement of elements or not, because that is a maintenance task you might have to do quite frequently. Maunsell redesigned the superheater between the Urie 4-6-0s and his own updated versions for precisely that reason - not much visible impact, but a big impact on ease of shed maintenance.

    If you removed all of the "plumbing" (to use your phrase) - air, vacuum, heating - from between the frames on a UK loco, where would you put it? In the US and some other countries, the practice was to put it alongside the boiler, but that country had a more generous loading gauge. Try that on a UK loco with a large boiler and narrow cab, and you start to constrict the forward visibility, which has its own consequences. So if instead you run it between the frames, it's a fairly small penalty to pay for equipment that will require minimal attention between heavy overhauls. Whereas motion, oiling points, axle box drains - those are absolutely things you want to be "get-at-able".

    Tom
     