Peak Rail General Discussion

本贴由 kestreleyes 于 2009-11-22 发布. 版块名称: Heritage Railways & Centres in the UK

  1. 5944

    5944 Resident of Nat Pres

    注册日期:
    2006-01-14
    帖子:
    10,482
    支持:
    13,033
    性别:
    男
    职业:
    Train Maintainer for GTR at Hornsey
    所在地:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Screenshot_20260515_124529_Facebook.jpg

    Certainly looks like it.
     
    已获得Johnme101, Bluenosejohn, 26D_M 和 另外1人的支持.
  2. 26D_M

    26D_M Part of the furniture

    注册日期:
    2009-10-22
    帖子:
    5,247
    支持:
    2,573
    Thanks, hadn't realised S100 was at Peak as well as S102. Has S100 run in preservation? I remember it being at YDR but thats nearly 50 years ago, probably straight out of NCB service .
     
    已获得alexl102的支持.
  3. 5944

    5944 Resident of Nat Pres

    注册日期:
    2006-01-14
    帖子:
    10,482
    支持:
    13,033
    性别:
    男
    职业:
    Train Maintainer for GTR at Hornsey
    所在地:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I believe it moved a a few years ago from Chasewater, after Mark Sealey became GM. It'll be ready next year I was told, but that was over 15 years ago! I understand a lot of parts disappeared when the old shed at Chasewater got demolished to make way for the M6 toll road.
     
    已获得alexl102和silversteellady的支持.
  4. 26D_M

    26D_M Part of the furniture

    注册日期:
    2009-10-22
    帖子:
    5,247
    支持:
    2,573
    Well if it is finished soon there'll be a scope for a PLA class event with S102 and 1857, currently at WSR. There's also 'Firefly' at Meldon but that seems to have gone off the radar somewhat ....
     
    已获得silversteellady的支持.
  5. estwdjhn

    estwdjhn Member

    注册日期:
    2013-01-24
    帖子:
    352
    支持:
    722
    职业:
    Boilermaker
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Firefly is still progressing quietly I think. Newtons supplied a new inner firebox and girders for it in the last couple of years or so. Like most locos, it will be done when it's done!
     
    已获得26D_M的支持.
  6. kestreleyes

    kestreleyes Well-Known Member

    注册日期:
    2007-10-04
    帖子:
    1,315
    支持:
    961
    职业:
    signal engineer
    Been a while since I last updated but things nice n steadily progressing, the new trackwork into the top of the car park for the new unloading / loading area and the bay platform is in, still wants some ballasting and the bay platform building.

    the footbridge column bases at darley are in.and erection is starting, there’s a lot of work on the riveting of the stair pieces under way.

    Signalling wise, two seperate fronts, Rowsley box is having a door end rebuild (typical midland boxes) and the shed gang progressing nicely with the new trident signal for entering Rowsley to signal the loop,main and bay platforms, others for the station end are also being built, there also a triple doll for shunting from same.

    pway are busy with foot crossing and block joint renewal jobs, a new siding off the turntable has been laid for the freight set, the sleeping coach restoration continues , new steps have been fabricated up for the sleeping coach for better access.

    the station buildings at Rowsley have had a lot of repainting work into maroon and cream by the gang, and there’s other bits going on I’ve already forgotten. IMG_3616.jpeg

    its a tad warm, but you already know that
     
    已获得Magna Junction, Bluenosejohn, brmp201 和 另外14人的支持.
  7. Breva

    Breva Part of the furniture

    注册日期:
    2010-10-11
    帖子:
    2,690
    支持:
    4,879
    所在地:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  8. Bikermike

    Bikermike Well-Known Member

    注册日期:
    2020-03-11
    帖子:
    2,309
    支持:
    2,649
    性别:
    男
    所在地:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    What @Breva said. Hello!
    Thank you for the update
     
  9. kestreleyes

    kestreleyes Well-Known Member

    注册日期:
    2007-10-04
    帖子:
    1,315
    支持:
    961
    职业:
    signal engineer
    Only a small update this week.

    work on Rowsley box continues, what started as change a few outside boards under the top window became remove half an end wall and rebuild, typical of midland boxes where the door meets the outside stairs you get water ingress, anyhow after what’s currently four days of work so far weve only got one window left to put back in once it’s been rebuilt by our LMSca colleagues (rebuild is an understatement….its more like triggers broom)

    work on the footbridge, trackwork in the bay line continues and new lineside farmers gates down the line all recent work, I think the Ashover gang are busy rebuilding waggons or coaches as I helped the delivery drivers drop off a load of timber for them yesterday.

    toms finishing off the trident signal outside and its base has been cast ready for erection soon.

    and now it’s cooling down hopefully we’re not going to be slowly cooked out there in railway land

    anyhow have a good weekend folks
     
    已获得The Dainton Banker, ilvaporista, ghost 和 另外5人的支持.
  10. FearOfManchester

    FearOfManchester Member

    注册日期:
    2016-01-24
    帖子:
    416
    支持:
    685
    性别:
    男
    所在地:
    Peak District
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It’s been a few months since the last update, with the running season going on this isn’t unexpected, but no news is good news in this case so here’s some tidbits-

    The remaining columns for the up platform and miscellaneous have been delivered from the engineering company, these were needed for more measurements and mock-ups for the landings and joining plates, the only piece still being worked on is the bridge span itself. Installation of these columns will come soon but an extension to the platform is on the cards and will coincide with this work, this will bring the platform back to its original length and hide the concrete pad which is nice to hear. The platforms are gritstone blocks, as is the vernacular round here, so not a cheap or easy task to find suitable material.

    IMG_4505.jpeg

    Meanwhile the mammoth task of riveting has taken place on the stair pieces, it’s taken a long old while to get here as every hole needed reaming out to a few set sizes, 2500 rivets were purchased, close to 1000 have been done so far.
    IMG_4498.jpeg
    IMG_4499.jpeg
    IMG_4500.jpeg

    Lovely progress, outside of the long rivet march, the next big thing may be the fitting of one of the staircases on the down platform.
     
    已获得banburysaint, Bluenosejohn, Kirk Oswald 和 另外9人的支持.
  11. FearOfManchester

    FearOfManchester Member

    注册日期:
    2016-01-24
    帖子:
    416
    支持:
    685
    性别:
    男
    所在地:
    Peak District
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Up platform padstones and columns now in place, as mentioned previously, the concrete slab will be hidden by the re-extended platform length. Some stones have been removed from the platform slope in preparation for this.
    IMG_4538.jpeg
    IMG_4539.jpeg

    Enjoy your weekend everyone.
     