If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

The end of the Lavender Line?

Discussion in 'Heritage railways & Centres in the Uk' started by Bramblewick, Mar 18, 2015.

  1. SomewhereintheSouthEast

    SomewhereintheSouthEast New Member

    Joined:
    Oct 9, 2016
    Messages:
    19
    Likes Received:
    2
    Location:
    Eastbourne
    Heritage Railway Volunteer:
    No I do not currently volunteer
    You're right my mistake Sorry.
     
  2. nanstallon

    nanstallon Part of the furniture

    Joined:
    Sep 8, 2005
    Messages:
    3,513
    Likes Received:
    732
    Gender:
    Male
    Occupation:
    Retired
    Location:
    Westcountry
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes, how British. If the travelling public won't fit within existing resources you have to discipline them.

    Build more capacity to give the public what they want - you must be joking.
     
  3. nine elms fan

    nine elms fan Active Member

    Joined:
    Sep 18, 2012
    Messages:
    770
    Likes Received:
    82
    Gender:
    Male
    Occupation:
    Semi-Retired
    Location:
    Norfolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I have been to the lavender line a few times, but in my opinion it has gone downhill since Dave Milham sold it a few years ago to the present owners.
     
  4. simon

    simon Resident of Nat Pres

    Joined:
    Jun 26, 2006
    Messages:
    7,947
    Likes Received:
    2,048
    We go round this regularly. Virtually every developed country has gone through a closure programme. Some closures now look to be poor decisions but it's a small number and we are talking about something that happened over 50 years ago.
     
    Forestpines and paulhitch like this.
  5. marshall5

    marshall5 Active Member

    Joined:
    Oct 26, 2010
    Messages:
    706
    Likes Received:
    254
    Location:
    i.o.m
    ...... and a lot of the closures attributed to the Doctor took place before 'The Reshaping of Britain's Railways' was written, and a great many more have taken place since.
    Ray.
     
  6. paulhitch

    paulhitch Part of the furniture

    Joined:
    Oct 12, 2008
    Messages:
    2,866
    Likes Received:
    1,069
    Gender:
    Male
    Location:
    Hayling Island
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    ...... plus World War Two interrupted a deep decline in use which resumed postwar,

    PH
     
  7. burmister

    burmister New Member

    Joined:
    Aug 2, 2008
    Messages:
    151
    Likes Received:
    67
    It is possible to get a single track between the sewage works and the Estate.

    Uckfield is still expanding like an exploding bomb. All of the farm to the east and north of the sewage works from A22 bypass to the old A22 is about to be built over, over 1,000 homes and the microscope is on the fields to the west a further 2/3,000 homes.

    On the Itchingfield Shoreham route which would form part of a BML bypass even more homes planned around Henfield after the current mega expansions to the North, West and South of the Crawsham twin conurbation, Southwater, Henfield ( + new large town mooted) and Steyning. As we had to stand from Brighton to Steyning in the peak hours in 1965 due to the massive increase in passenger numbers after the Oxted DEMU were introduced and the line being relaid (just before closure )a reinstated line should run at a operating profit. SR were gearing up to electrify it just before WW2

    Getting back to Lavender new management in place so I suspect things will improve for the better rather than tread water.

    Brian
     
  8. Zoomeg

    Zoomeg New Member

    Joined:
    Sep 3, 2010
    Messages:
    58
    Likes Received:
    3
    Is the need to close Clayton Tunnel for repairs (and possible re-opening of Uckfield - Lewes to cope with the traffic) real or just a possibility? as going Brighton - London via Lewes would involve a change of train to get anywhere but London Bridge possibly twice it doesn't seem to save much time over just going via Littlehampton (or a new N-E spur off the Mid Sussex Line) or even just reversing back up to Wivelsfield (with a remodelling of Lewes station)
     
  9. DisusedBranch

    DisusedBranch Active Member

    Joined:
    Jun 17, 2009
    Messages:
    709
    Likes Received:
    426
    Location:
    Here be haggis
    Heritage Railway Volunteer:
    No I do not currently volunteer
    As mentioned above, the reopening of the Uckfield - Lewes line has been being trumpeted by a small-but-vocal minority for decades, from since before BR singled much of it, knocked down half of Crowborough station, rebuilt Uckfield station on the north side of the level crossing and so on. Any closure of Clayton Tunnel for repairs will make not a shred of difference to the fact that, IMO, it will never happen.

    I commuted from Eridge to Uckfield for a couple of years in the 1980s and felt at the time, as I do now, that the singling and rationalisation of the line (which I watched happen and was rather sad about witnessing) sounded the final death knell of any chance whatsoever for the line to be reopened throughout - or indeed for what remains to ever be electrified.

    One of my fondest memories of it is of standing in what was the down-side waiting room at Crowborough in the depths of winter, a howling blizzard outside and a roaring fire in the grate. For half an hour or so it felt like being on the BR that I was born just too late to remember.
     
    Black Jim likes this.

Share This Page